MoMA Time Based Media Conservation
Samuel Anderson Architects was asked by The Museum of Modern Art to expand on our previous Conservation Department design by adding a suite of spaces for Time Based Media (“TBM”) Conservation on the 10th floor of the museum tower building. The space where the Time Based Media conservators were then working was a closet-like space in the basement, which was overly crowded and lacked essential functionality.
The new location for the department is a 3,500 square foot space with museum grade climate control and windows providing natural light for the conservators’ workstations. The specially designed rooms include a close listening & viewing room for the conservation of TBM artworks, an ingest workroom, a mock-up gallery to test media art installations, and a conservator workstation suite.
The mock-up gallery is designed to accommodate a large variety of set-up possibilities with ceiling and floor mounted devices, a suspension system, and a large fold-out gallery wall, as well as large closets for AV equipment storage. We designed all finishes and lighting to mimic the TBM galleries in the museum. The close listening & viewing room was designed to allow the conservators to treat the full range of time based media works, with full acoustic separation and highly adjustable lighting. There are five types of acoustic panels on the walls and ceiling to both absorb and diffuse amplified sound appropriately.
Opened in 2020, The MoMA Time Based Media department has been widely received as a great success by conservators, curators, and artists.
Client: The Museum of Modern Art
Design Team: Kayt Brumder, Sam Sol, Karina Chivikova, JB&B Engineering (MEP), Severud (Structural), Acoustic Distinctions (Acoustic Consultant)
Builder: Mass Contracting
Photographs: Paul Warchol






